Critical Path

On First-Name Terms with Healers

Level 25 Human Paladin · Alliance · US Normal · <JNCO> · Seen 8 days ago · Updated 8 hours ago

This character's image arrives soon after the page's first visit.

  • Goblin HammerMain hand · 15.3 DPS
    23
  • Mirror of Rath'maelOff hand · Enchanted
    24

3 of these items are for sale at US Normal's Alliance auction house right now. Buying them all would cost 36 silver 53 copper.

Lifetime stats

2
drinks consumed
27
meals eaten
31
deaths
1
quest abandoned
2,443
total kills
13
critters killed
176
fish caught
1
elixir consumed
33
times camped
14
flight paths taken
9
times hearthed
7
health potions
All 53 stats
  • Times camped33
  • Bandages used2
  • Health potions consumed7
  • Elixirs consumed1
  • Beverages consumed2
  • Food eaten27
  • Most factions at Honored or higher1
  • Most Alliance factions at Exalted4
  • Total factions encountered8
  • Mounts owned2
  • Greed rolls made on loot81
  • Need rolls made on loot16
  • Total deaths from other players1
  • Total deaths from opposite faction1
  • Total 5-player dungeons entered8
  • Edwin VanCleef Kills (Deadmines)3
  • Rath'mael Kills (Ruins of Lordaeron)1
  • Durgen Dirgehammer Kills (Hall of Thanes)1
  • Bazzalan kills (Ragefire Chasm)1
  • Total kills2,443
  • Total kills that grant experience or honor2,279
  • Creatures killed2,429
  • Different creature types killed8
  • Critters killed13
  • Total Honorable Kills1
  • World Honorable Kills1
  • Total Killing Blows1,138
  • World Killing Blows996
  • Total deaths31
  • Total raid and dungeon deaths5
  • Total deaths in 5-player dungeons5
  • Revived by druids6
  • Redeemed by paladins1
  • Quests completed185
  • Quests abandoned1
  • Professions learned2
  • Professions at maximum skill2
  • Secondary skills at maximum skill3
  • Weapon skills at maximum skill5
  • Cooking skill92
  • Cooking Recipes known30
  • First Aid skill83
  • First Aid Manuals learned16
  • Fishing skill125
  • Fish caught176
  • Fish and other things caught176
  • Highest Blacksmithing skill75
  • Blacksmithing Plans learned68
  • Highest Mining skill86
  • Smelting Recipes learned15
  • Flight paths taken14
  • Number of times hearthed9
  • Total waves1

Standings

LeaderboardOverallUS NormalPaladins
Most deaths#288,307 of 688,651#54,145 of 196,857#30,963 of 95,789
Most Need rolls#208,268 of 417,586#40,131 of 111,408#31,576 of 58,438
Highest levels#467,411 of 846,723#116,486 of 264,376#66,969 of 117,421
Most waves#197,075 of 298,365#57,812 of 91,017#27,015 of 41,204
Most critters killed#422,090 of 625,867#101,826 of 172,127#57,937 of 86,919
Most honorable kills#303,397 of 353,255#25,301 of 37,882#41,282 of 48,545
Most drinks#562,708 of 622,103#157,797 of 176,245#86,410 of 92,616
Most quests abandoned#591,004 of 636,340#159,996 of 176,709#79,454 of 86,430

Only counts characters we know about so far.

Talents 0 / 2 / 12, 14 points

What other Paladins pick

Holy 0

  • 0/5
  • 0/5

Protection 2

  • 0/5
  • 2/5

Retribution 12

  • 0/5
  • 5/5
  • 2/2
  • 0/3
  • 3/3
  • 0/3
  • 0/2
  • 0/1
  • 2/2

Collections

Not fetched yet. It arrives soon after this page's first visit.

Reputation

Not fetched yet. It arrives soon after this page's first visit.

    Nearly there closest first

    • Left: Westfall Lighthouse
      • Moonbrook, done
      • The Molsen Farm, done
      • Gold Coast Quarry, done
      • Sentinel Hill, done
      • The Jansen Stead, done
      • Jangolode Mine, done
      • Westfall Lighthouse, not yet
      • The Dust Plains, done
      • Alexston Farmstead, done
      • Saldean's Farm, done
      • The Dead Acre, done
      • The Dagger Hills, done
      • Demont's Place, done
      • Furlbrow's Pumpkin Farm, done
    • 150 Blacksmithing Skill - 75 to go

    • Left: Wailing Caverns, Shadowfang Keep, Excavation Site: Wetlands
      • Ragefire Chasm or Hall of Thanes, done
      • Ruins of Lordaeron, done
      • Wailing Caverns, not yet
      • The Deadmines, done
      • Shadowfang Keep, not yet
      • Excavation Site: Wetlands, not yet
    • 13 left
      • Misty Pine Refuge, not yet
      • Iceflow Lake, not yet
      • Helm's Bed Lake, done
      • Shimmer Ridge, not yet
      • Anvilmar, not yet
      • Chill Breeze Valley, not yet
      • Kharanos, not yet
      • The Tundrid Hills, done
      • Amberstill Ranch, not yet
      • Coldridge Pass, not yet
      • Gol'Bolar Quarry, done
      • North Gate Outpost, not yet
      • Frostmane Hold, not yet
      • Brewnall Village, not yet
      • The Grizzled Den, not yet
      • Gnomeregan, not yet
      • Gates of Ironforge, done
      • South Gate Outpost, done
    8 more started
    • 9 left
      • Southshore, done
      • Dun Garok, not yet
      • Hillsbrad Fields, done
      • Purgation Isle, not yet
      • Azurelode Mine, not yet
      • Darrow Hill, not yet
      • Tarren Mill, not yet
      • Durnholde Keep, not yet
      • Nethander Stead, not yet
      • Eastern Strand, not yet
      • Western Strand, done
      • Southpoint Tower, not yet
    • 9 left
      • Ironband's Excavation Site, not yet
      • Grizzlepaw Ridge, not yet
      • North Gate Pass, not yet
      • Stonewrought Dam, not yet
      • The Farstrider Lodge, not yet
      • Mo'grosh Stronghold, not yet
      • The Loch, not yet
      • Thelsamar, done
      • Stonesplinter Valley, not yet
      • Valley of Kings, done
      • Silver Stream Mine, not yet
    • 11 left
      • Twilight Grove, not yet
      • Manor Mistmantle, not yet
      • Darkshire, done
      • The Hushed Bank, not yet
      • Vul'Gol Ogre Mound, not yet
      • The Yorgen Farmstead, not yet
      • Brightwood Grove, not yet
      • Tranquil Gardens Cemetery, not yet
      • The Darkened Bank, done
      • Addle's Stead, not yet
      • Raven Hill, not yet
      • Raven Hill Cemetery, not yet
      • The Rotting Orchard, not yet
    • 8 left
      • Bashal'Aran, not yet
      • Ruins of Mathystra, not yet
      • Remtravel's Excavation, not yet
      • Auberdine, done
      • Tower of Althalaxx, not yet
      • Ameth'Aran, not yet
      • The Master's Glaive, not yet
      • Cliffspring River, not yet
      • Grove of the Ancients, not yet
    • 21 left
      • Alterac Mountains, not yet
      • Arathi Highlands, not yet
      • Badlands, not yet
      • Blasted Lands, not yet
      • Burning Steppes, not yet
      • Deadwind Pass, not yet
      • Dun Morogh, not yet
      • Duskwood, not yet
      • Eastern Plaguelands, not yet
      • Elwynn Forest, done
      • Hillsbrad Foothills, not yet
      • The Hinterlands, not yet
      • Loch Modan, not yet
      • Redridge Mountains, done
      • Riverglades, not yet
      • Searing Gorge, not yet
      • Silverpine Forest, not yet
      • Stranglethorn Vale, not yet
      • Swamp of Sorrows, not yet
      • Tirisfal Glades, not yet
      • Western Plaguelands, not yet
      • Westfall, not yet
      • Wetlands, not yet
    • 14 left
      • North Tide's Hollow, not yet
      • The Dead Field, not yet
      • Deep Elem Mine, not yet
      • The Greymane Wall, not yet
      • Malden's Orchard, not yet
      • The Shining Strand, not yet
      • The Decrepit Ferry, not yet
      • The Sepulcher, not yet
      • Olsen's Farthing, not yet
      • Ambermill, done
      • Pyrewood Village, not yet
      • The Skittering Dark, not yet
      • Fenris Isle, not yet
      • Shadowfang Keep, not yet
      • Beren's Peril, not yet
    • 14 left
      • Saltspray Glen, not yet
      • Ironbeard's Tomb, not yet
      • Raptor Ridge, not yet
      • Whelgar's Excavation Site, not yet
      • Black Channel Marsh, not yet
      • Sundown Marsh, not yet
      • Dun Modr, not yet
      • Dun Algaz, not yet
      • The Green Belt, not yet
      • Mosshide Fen, not yet
      • Bluegill Marsh, not yet
      • Angerfang Encampment, not yet
      • Grim Batol, not yet
      • Menethil Harbor, done
      • Direforge Hill, not yet
    • 15 left
      • Deathknell, not yet
      • Agamand Mills, not yet
      • Brill, not yet
      • Garren's Haunt, not yet
      • Balnir Farmstead, not yet
      • Crusader Outpost, not yet
      • Whispering Gardens, not yet
      • Nightmare Vale, not yet
      • The Bulwark, not yet
      • Cold Hearth Manor, not yet
      • Solliden Farmstead, not yet
      • Brightwater Lake, not yet
      • Scarlet Watch Post, not yet
      • Venomweb Vale, not yet
      • Stillwater Pond, not yet
      • Undercity, done

    Character sheet

    item level
    16

    Not fetched yet. It arrives soon after this page's first visit.

    Member of JNCO

    See the roster