Earned Value

Healthstone Gourmet

Level 45 Undead Warlock · Horde · US Normal · <Fault> · Seen today · Updated 1 hour ago

This character's image arrives soon after the page's first visit.

  • Sacrificial SwordMain hand · 18.9 DPS
    42
  • Orb of Dar'OrahilOff hand · +5 Intellect
    40
  • Gravestone ScepterRanged · 29.0 DPS
    29

3 of these items are for sale at US Normal's Horde auction house right now. Buying them all would cost 22 silver 20 copper.

Lifetime stats

245
drinks consumed
301
meals eaten
38
deaths
32
quests abandoned
7,346
total kills
114
critters killed
5
elixirs consumed
135
items disenchanted
17
times camped
136
flight paths taken
34
times hearthed
42
health potions
All 62 stats
  • Times camped17
  • Bandages used73
  • Health potions consumed42
  • Mana potions consumed4
  • Elixirs consumed5
  • Beverages consumed245
  • Food eaten301
  • Healthstones used87
  • Most factions at Revered or higher1
  • Most factions at Honored or higher5
  • Most Horde factions at Exalted4
  • Total factions encountered19
  • Mounts owned3
  • Greed rolls made on loot274
  • Need rolls made on loot12
  • Total 5-player dungeons entered13
  • Total 10-player raids entered1
  • Scarlet Commander Mograine kills (Scarlet Monastery)1
  • Rath'mael Kills (Ruins of Lordaeron)1
  • Shade of the Archmage Kills (City of Dalaran)2
  • Lyn the Ignored Kills (City of Dalaran)2
  • Bazzalan kills (Ragefire Chasm)1
  • Mutanus the Devourer kills (Wailing Caverns)2
  • Archmage Arugal kills (Shadowfang Keep)1
  • Aku'mai kills (Blackfathom Deeps)1
  • Charlga Razorflank kills (Razorfen Kraul)1
  • Amnennar the Coldbringer kills (Razorfen Downs)1
  • High Inquisitor Whitemane kills (Scarlet Monastery)1
  • Total kills7,346
  • Total kills that grant experience or honor5,738
  • Creatures killed7,232
  • Different creature types killed9
  • Critters killed114
  • Total Killing Blows4,718
  • World Killing Blows4,032
  • Total deaths38
  • Total raid and dungeon deaths6
  • Total deaths in 5-player dungeons6
  • Resurrected by soulstones7
  • Quests completed537
  • Quests abandoned32
  • Professions learned2
  • Professions at maximum skill2
  • Secondary skills at maximum skill2
  • Weapon skills at maximum skill5
  • Cooking skill225
  • Cooking Recipes known38
  • First Aid skill225
  • First Aid Manuals learned30
  • Highest Enchanting skill175
  • Enchanting formulae learned95
  • Materials produced from disenchanting263
  • Items disenchanted135
  • Highest Tailoring skill145
  • Tailoring Patterns learned116
  • Flight paths taken136
  • Mage Portals taken1
  • Mage portal taken most1
  • Number of times hearthed34
  • Total times LOL'd1
  • Total cheers3
  • Total waves1

Standings

LeaderboardOverallUS NormalWarlocks
Most critters killed#9,874 of 314,533#1,968 of 86,993#463 of 28,179
Highest levels#28,556 of 489,850#5,201 of 159,656#2,098 of 46,111
Most drinks#41,716 of 315,210#9,240 of 90,437#1,342 of 32,322
Most quests abandoned#63,201 of 322,922#12,942 of 90,255#5,333 of 29,626
Most deaths#105,949 of 352,429#17,284 of 101,978#12,489 of 33,096
Most Need rolls#197,961 of 319,495#42,459 of 86,674#17,007 of 29,467
Most waves#96,993 of 149,911#29,557 of 46,781#8,747 of 13,480

Only counts characters we know about so far.

Talents 31 / 5 / 0, 36 points

What other Warlocks pick

Affliction 31

  • 0/2
  • 5/5
  • 5/5
  • 2/2
  • 0/2
  • 3/3
  • 0/2
  • 3/3
  • 0/1
  • 0/3
  • 1/5
  • 2/2
  • 1/1
  • 3/3
  • 5/5
  • 1/1

Demonology 5

  • 0/2
  • 0/3
  • 0/5
  • 5/5
  • 0/2
  • 0/3
  • 0/3
  • 0/2

Destruction 0

  • 0/2
  • 0/5
  • 0/5

Professions

Tailoring145 / 225
Enchanting175 / 225
Cooking225 / 225
First Aid225 / 225
  • Tailoring recipes57
  • Enchanting recipes47

Collections

Not fetched yet. It arrives soon after this page's first visit.

Reputation

Not fetched yet. It arrives soon after this page's first visit.

    Character sheet

    item level
    31

    Not fetched yet. It arrives soon after this page's first visit.

    Member of Fault

    See the roster